    Malabo Wastewater Treatment Project, Equatorial Guinea

    View More
  • 62

    Sudan Garri-4 Sponge Coke Fired Power Plant Project

    Sudan Garri-4 Sponge Coke Fired Power Plant Project is the Key Electrical Project of Sudan. The project designed as consisting of 2 units of 240t/h Circulating Fluid Bed (CFB) sponge coke fired boilers and 2 units of 55MW turbine generators. The entire installed capacity is 110MW. The date of Contract Signed is December 24, 2004. The effective date of the project is November 16, 2006. According to the contract, the first unit completion duration is 24 months. The second unit completion duration is 26 months.

    View More
    Signing Date:
    2004-12-24
    Contract Date:
    2006-11-27 -- 2008-11-16
    Value:
    $129398098.40
    Owner:
    Sudan Thermal power company (former: National Electricity of Sudan)
  • 63

    The Third Bridge in Bamako

    Project Location: Bamako, Mali 
    Project achievements: The largest engineering aid project in West Africa undertaken by Chinese companies was successfully completed eight months in advance. We are responsible for bridge engineering, interchange project, traffic safety and facilities along the line. The bridge is 2,294.2 meters in length, of which the bridge length is 1,626.5 meters, divided into 69 cross.
    View More
  • 64

    Emergency Power Supply Project

    The total installed capacity of the project is 241.355KW. CMEC will install 6 units of 30MW gas turbines in 5 different stations, 75 units of diesel generator set which power range is from 150KW to 1800KW in 58 stations. The scope of work includes engineering design, civil works, equipment supply, transportation, installation, training, commissioning and acceptance. The whole project is a turnkey project.

    View More
    Signing Date:
    2011-11-23
    Contract Date:
    2012-05-28 -- 2016-12-31
    Value:
    $455475706.67
    Owner:
    PDVSA
  • 65

    Surabaya-Madura Bridge, Indonesia

    Cable-stayed bridge with main span 434m (total length: 5438m).
    So far the biggest overseas bridge project undertaken by CRBC.
    Commenced in 2005 and completed in 2009.
    View More
  • 66

    Malabo Gas Turbine Power Plant Extension Project

    Malabo Gas Turbine Power Plant Extension Project, based on the contract with Ministry of Mines, Industry and Energy (MMIE), Equatorial Guinea and China Machinery & Engineering Corporation (CMEC), which has been signed the contract on December 26th, 2009. The total contract amount is 99,991,142.00 euros. The project is EPC turnkey projects. It has been built 3 new 6B Series single-cycle gas-fired units for the city of Malabo, which installed capacity of 3 × 42MW,It was officially started construction on Oct 7th, 2010 at site of project. On June 4th, 2011, # 1 gas turbine unit operated successfully.

    View More
    Signing Date:
    2009-10-26
    Contract Date:
    2010-10-07 -- 2011-10-14
    Value:
    $129941569.33
    Owner:
    Ministry of Mines, Industry and Energ (MMIE),Equatorial Guinea