English
  • China
  • 31

    Central Bank of Kuwait

    Total Weight of Steel Structure: 9000t.
    Scope of Contract: Design, fabrication and installation of Steel structure.
    View More
  • 32

    Penny's Bay Development, Contract 1&2 (Disney Land), Hong Kong

    Reclamation of 250 hectares.
    7315 m of Jetty.
    Dredging & Train 8.2 million m3.
    20km road work & bridges.
    250 hectares of foundationtreatment.
    View More
  • 33

    Transmission Line and Substations for Djiploho Hydro Power Station Project

    Power transmission lines of 220 KV, 110KV and 20KV; 26 power substations of 220/110/20KV, 1 national power dispatching center.
    Project Highlight: The entire power grids is fully automatic and unattended.
    View More
  • 34

    Leachate Treatment MVC System, ZLD

    Over 30 systems installed in China for Leachate Treatment. With capacities ranging from 50 to 500 M3/D MVC.
    View More
  • 35

    Tianjin Floating LNG Terminal Station Project

    The First Floating LNG Terminal Station of China.
    View More
  • 36

    Wuhan Tianhe International Airport T3, China

    Building Area:495000 square meters.                                                            
    The total construction area of 495,000 square meters, the highest passenger throughput up to 35 million passengers is the largest two-runway airport in central China and the largest Aviation hub.
    View More
  • 37

    CPL-CSM of Tangshan Fengnan

    Location: Hebei Province.
    Capacity: 1.2Mt/a.
    The first large modern cold rolling & galvanizing line in China supplied by a Chinese engineering company on EPC basis.
    View More
  • 38

    ErLangMiao Sewage Water Treatment, Wuhan, China

    240,000m³/d.

    View More
  • 39

    Jiangsu Unicom Aoti Complex Building

    70,000 square meters.
    View More
  • 40

    Al-Mashaar Al-Mugaddassah Metro Project-Southern Line

    Project Location: Makkah, Saudi Arabia  
    Project achievements:The project is east-west stretch from the Arafat Area to Jamarat Area of the Holy Makkah, while the construction work includes engineering, procurement and construction for: 17.7 km double track Mainline, including 3.14 km at-grade and 14.56 km viaduct.
    View More
Prev 1 2 3 4 5 6 7 Next