Projects

  • Power Plant & sea water desalination for Rabigh Industry City in Kingdom of Saudi-Arabia
  • Combined Cycle Power Plant & sea water desalination for Salwa Industry City in Kingdom of Saudi-Arabia
  • Infrastructure Construction Project of SALWA Industrial City in Kingdom of Saudi-Arabia
  • Combined Cycle Power Plant & Desalination Project of JEDDAH’s Second and Third Industrial City in the Kingdom of Saudi-Arabia
  • Infrastructure Construction of JEDDAH’s Third Industrial City in the Kingdom of Saudi-Arabia
  • Infrastructure Construction of Rabigh Industry City in Kingdom of Saudi-Arabia
  • Al-Oyaynah Smart Community
Estimated Value
Nearly 2.5 billion US dollars for power plant of the economic city.
Project Location
Rabigh City, Saudi Arabia. Approximately 3 km away from the Red Sea, adjacent to highway 5, a major traffic artery of Saudi Arabia.
Work Content and Scope
EPC general contractor intends to build a combined cycle power plant with power supply capacity as ~ 1,200MW, desalination capacity as ~ 100,000 m³/d and cooling capacity as ~ 30MW. It is designed to use natural gas and build 3 one-drive-ones (three 9F gas turbine generator unit + three vertical natural circulation triple-pressure HRSG + three 160MW triple-pressure condensing steam turbine generator unit). In respect of desalination equipment, the contractor intends to adopt advanced domestic desalination technological equipment as well as thermal multistage evaporation MED-TVC technology in intercepting various inorganic ions, colloidal substances and macromolecular solutes in seawater so as to obtain clean water. The thermal multistage evaporation process features ****** operation and low energy consumption, and has been developed rapidly in the past 20 years. Now the technology has been used for desalination widely and become more mature and reliable. The project includes 25-year guaranteed operation period of the power plant and desalination.
Estimated Value
Nearly 4 billion US dollars for power plant of the economic city.
Project Location
Salwa City, Saudi Arabia. Approximately 300m away from the Persian Gulf sea, adjacent to the major traffic artery of Saudi Arabia and the Gulf.
Work Content and Scope
The contractor intends to build a combined cycle power plant with power supply capacity as ~ 1,500MW, desalination capacity as ~ 200,000 m³/d and cooling capacity as ~ 50MW. It is designed to use natural gas and build four one-drive-ones (four 9F gas turbine generator unit + four vertical natural circulation triple-pressure HRSG + four 160MW triple-pressure condensing steam turbine generator unit). In respect of desalination equipment, the contractor intends to adopt advanced domestic desalination technological equipment as well as thermal multistage evaporation MED-TVC technology in intercepting various inorganic ions, colloidal substances and macromolecular solutes in seawater so as to obtain clean water. The thermal multistage evaporation process features ****** operation and low energy consumption, and has been developed rapidly in the past 20 years. Now the technology has been used for desalination widely and become more mature and reliable. The project includes 25-year guaranteed operation period of the power plant and desalination.
Estimated Value
8-9 billion US dollars for infrastructure construction of the economic city.
Project Location
Salwa City, Saudi Arabia. Approximately 300m away from the Persian Gulf sea, adjacent to the major traffic artery of Saudi Arabia and the Gulf.
Work Content and Scope
The urban planning & infrastructure construction covering a total area of 70 square meters includes intelligent urban design, ground levelling, intraregional roads, such pipeline management systems for water, electricity and gas, other underground infrastructure construction as well as urban power supply facility construction.
Estimated Value
Nearly 3 billion US dollars for power plant of the economic cities.
Project Location
60 km to the south of Jeddah, 6 km away from the Red Sea, adjacent to the major traffic artery of Saudi Arabia.
Work Content and Scope
EPC general contractor intends to build a combined cycle power plant with power supply capacity as ~ 1,370MW, desalination capacity as ~ 200,000 m³/d and cooling capacity as ~ 36MW. It is designed to use natural gas and build 3 one-drive-ones (three 9F gas turbine generator unit + three vertical natural circulation triple-pressure HRSG + three 160MW triple-pressure condensing steam turbine generator unit). In respect of desalination equipment, the contractor intends to adopt imported equipment made in Japan and Korea or advanced domestic desalination technological equipment as well as thermal multistage evaporation or RO multistage reverse osmosis technology in intercepting various inorganic ions, colloidal substances and macromolecular solutes in seawater so as to obtain clean water. The thermal multistage evaporation process features ****** operation and low energy consumption, and has been developed rapidly in the past 20 years. Now the technology has been used for desalination widely and become more mature and reliable. The project includes 25-year guaranteed operation period of the power plant and desalination.
Estimated Value
Nearly 3-4 billion US dollars for infrastructure construction of the economic cities.
Project Location
60 km to the south of Jeddah, 6 km away from the Red Sea, adjacent to the major traffic artery of Saudi Arabia.
Work Content and Scope
The urban planning & infrastructure construction covering a total area of 88 square meters includes intelligent urban design, ground levelling, intraregional roads, such pipeline management systems for water, electricity and gas, other underground infrastructure construction as well as urban power supply facility construction.
Estimated Value
2-2.5 billion US dollars for infrastructure construction of the economic city.
Project Location
Rabigh City, Saudi Arabia. Approximately 3 km away from the Red Sea, adjacent to highway 5, a major traffic artery of Saudi Arabia.
Work Content and Scope
The urban planning & infrastructure construction covering a total area of 70 square meters includes intelligent urban design, ground levelling, intraregional roads, such pipeline management systems for water, electricity and gas, other underground infrastructure construction as well as urban power supply facility construction.
Owner Information
Ministry of Housing, Saudi Arabia
Target Population and Scale
Salwa City, Saudi Arabia. Approximately 300m away from the Persian Gulf sea, adjacent to the major traffic artery of Saudi Arabia and the Gulf
Owner’s Basic Requirements of Community Functions
lightweight steel structure, centralized piped water supply, piped gas supply, h gas storage tanks and pressure station, water supply connected to the municipal mains; the intelligentized small gas turbine cooling comprehensive system, and sponge-like city (annual precipitation of Saudi Arabia is less than 200 mm). Home About us Project Business Customer service News Contact us All rights reserved 1996-2015 Jiangsu focal point project consulting service Limited company all rights reserved All project information above is authorized by JSG exclusively.

Consortium Members

More >
  • 工商银行
  • 中国银行
  • 中国民生银行
  • WorleyParsons
  • Turgenbo
  • EY
  • 国浩律师事务所
  • AVIC APC
  • FOCUS
  • NEPDI
  • 南京师范大学
  • CMEC
  • 中国核建
  • 中国建筑
  • 中国能建
  • 协鑫
  • 中国东方电气
  • JINMEN GROUP
  • 国家电网公司